As part of the major public transport project of the Réseau Électrique Métropolitain (REM), the NouvLR consortium had to manage a large number of conflicts between its future infrastructures and existing urban technical networks (UTN).

Infrastructel was first mandated by NouvLR to support and assist the tender team in the analysis, cost estimation and development of solutions regarding various potential conflicts with UTNs. for the Autoroute Bonaventure and Bassin Peel sectors, as well as for the Brossard sector.

After NouvLR has been awarded the project, NouvLR again retained the services of Infrastructel to support the project and construction teams for a period of more than 6 months to carry out the analysis, management, coordination and technical support for work to relocate UTNs in connection with the Brossard and Deux-Montagnes hub. During this period, a team of 3 people (2 engineers, 1 senior technician) were dedicated to this mandate at the NouvLR project office.

We also carried out several specific engineering mandates for various underground piping needs specific to the REM's needs in the Peel Basin, Panama Station and Montreal Airport sectors.